Free planning model

SOC 2 cost calculator

Build a defensible first-year budget by employee count and cloud complexity. This calculator never presents modeled assumptions as collected market data.

1 · Scope2 · Cost model3 · Planning range
Modeled first-year range$20,000$48,000

A planning range, not a live quote. Scope changes, control gaps and auditor capacity can move the final fee.

3945 weeksestimated path$10,500$31,000modeled renewal year

What drives the estimate

Independent audit$9,000$18,000
Compliance platform$4,000$15,500
Readiness support$7,000$14,500
Preparation913 weeks

Control design, policies, integrations and evidence readiness.

Audit fieldwork610 weeks

Evidence sampling, questions, exceptions and report review.

Largest uncertaintyAuditor capacity

Validate scope before treating any estimate as a budget.

Methodology and assumptions

The model scales transparent baseline ranges by employee count, environment complexity, audit type, criteria count, support model and urgency. It separates the independent audit, software and readiness work so buyers do not mistake one fee for the entire program.

Compare matching auditors
Embed this calculator<iframe src="https://web-production-0b8a5.up.railway.app/embed/soc2-cost-calculator" width="100%" height="760" loading="lazy"></iframe>

What the model includes

Independent audit fees, compliance tooling, and optional readiness support. It excludes internal remediation engineering, penetration testing, legal work, and insurance because those vary materially by scope.

When to request quotes

Use the estimate for planning, then request written quotes after defining Trust Services Criteria, audit type, observation period, systems in scope, and required completion date.

SOC 1SOC 2SOC 3Type IType IIAudit readinessTrust centersVendor riskSecurity evidenceProcurement